REHABILITATION OF GEEDISOOY WATER CATCHMENT(DAM)

ADRA rehabilitated the dam and increased the size to catch more water as the rainy season is approaching and carry out de-silting, removed the earthy materials, such as sand and mud, plants, rubbish from the beds and inside of the dam.